Main Avenue Road Improvements

MONDAY 04/24/2023

Main Avenue – At Nassau Boulevard – Pratt Brothers, Inc. will be installing traffic loops on Main Ave at Nassau Boulevard. ROADS WILL BE TEMPORARILY CLOSED to allow work to be done. Roads will be accessible for emergency vehicles in case of emergency. We appreciate your understanding and cooperation during the construction and will attempt to keep the inconveniences to a minimum.

THURSDAY 03/30/2023

Main Avenue – Meadbrook Road to Nassau Boulevard – Pratt Brothers, Inc. will be milling this section of roadway. ROADS WILL BE TEMPORARILY CLOSED to allow work to be done. Homeowners will have limited access to their driveways, except for when the milling work is being performed directly in front of their property. There will be no access to the train station parking lot. Parking will be allowed on the side streets for the train station. Roads will be accessible for emergency vehicles in case of emergency. However, emergency vehicles should plan to detour around the street if the emergency is not on the street being milled.

FRIDAY 03/31/2023

Main Avenue – Meadbrook Road to Nassau Boulevard – Pratt Brothers, Inc. will be repaving this section of roadway. ROADS WILL BE TEMPORARILY CLOSED to allow work to be done. If homeowners need access to their vehicles during this time, they will have to be removed from their driveways and parked at the nearest side block before 7:00 AM. There will be no access to the train station parking lot. Parking will be allowed on the side streets for the train station. Road will be accessible for emergency vehicles in case of emergency. However, emergency vehicles should plan to detour around the street if the emergency is not on the street being repaved. 

We appreciate your understanding and cooperation during the construction and will attempt to keep the inconveniences to a minimum. This schedule is subject to change and is weather permitting.